G324: Advanced Portfolio in Media
Electronic format for my A2 Media Studies coursework.
Showing posts with label Schedule. Show all posts
Showing posts with label Schedule. Show all posts
Sunday, 9 December 2012
Thursday, 18 October 2012
Filming schedule for new scenes
New intro scene of young protagonist painting and singing
Friday 19th October
1600 Set up camera on tripod, facing down onto floor
1605 Film newspaper falling from up above and landing on the floor. Making sure that the camera can clearly see the headline and image.
Saturday 20th October
1000 Arrive at cousin's house to film.
1015 Set up room with barely any furniture and props on floor
1030 Practise run through of filming with young actress as she sings and paints picture of mask
1045 Film scene a few times with different angles
1100 Filming little girl screaming into the camera
1115 Finish filming with little girl
Afternoon
1400 Film protagonist switching on lights
1415 Film POV of protagonist seeing masked person in corner and switching light on again to reveal them gone
During this piece of filming, I will be filming close-ups of the little girl singing and then looking into the camera. I will also film a long shot of her painting and then pan round to reveal the image that she is painting.
Friday 19th October
1600 Set up camera on tripod, facing down onto floor
1605 Film newspaper falling from up above and landing on the floor. Making sure that the camera can clearly see the headline and image.
Saturday 20th October
1000 Arrive at cousin's house to film.
1015 Set up room with barely any furniture and props on floor
1030 Practise run through of filming with young actress as she sings and paints picture of mask
1045 Film scene a few times with different angles
1100 Filming little girl screaming into the camera
1115 Finish filming with little girl
Afternoon
1400 Film protagonist switching on lights
1415 Film POV of protagonist seeing masked person in corner and switching light on again to reveal them gone
During this piece of filming, I will be filming close-ups of the little girl singing and then looking into the camera. I will also film a long shot of her painting and then pan round to reveal the image that she is painting.
Monday, 1 October 2012
Filming day 2
Schedul for Sunday 30th September 2012.
15.00 Film scene of girl running.
15.15 Film POV shot of running and falling over
15.30 Film scene of POV and masked demon
15.45 Film scene of mask in bushes
15.50 Film scene of demon in bushes
15.00 Film scene of girl running.
15.15 Film POV shot of running and falling over
15.30 Film scene of POV and masked demon
15.45 Film scene of mask in bushes
15.50 Film scene of demon in bushes
Friday, 14 September 2012
Filming schedule for Saturday 15th September
Filming schedule
1300 Film make-up close up’s
1330 Film mirror scene
1400 – 1530 Film montage scenes of:
#1 Girl opens door and peers out (camera from outside)
#2 Water washes face as if scared
#1 Girl opens door and peers out (camera from outside)
#2 Water washes face as if scared
1500 Film last scene of girl waking up in bed with masked figure in background.
1515 Film girl waking up from nightmare scene
1515 Film girl waking up from nightmare scene
Friday, 15 June 2012
Schedule
June
15 - 22
|
Research
real trailers from a range of genres. Select genre for construction |
June
22 - 26
|
Research
further into selected genre (subgenres, conventions, etc...) |
June
26 - 29
|
Look at
range of different trailers from chosen genre and closely analyse them. |
June
30 - July 5
|
Look at
media theories and applying them to chosen genre |
July
5 - 10 July
|
Conduct
audience feedback into genres and then look at results |
July
10 - 19 July
|
Research
real magazine covers |
Over
summer - September
|
Start
construction ideas for own trailer |
Over
summer - September
|
Look at
chosen genre codes and conventions, especially within trailers |
Over
summer - September
|
Look at
target audience |
September
6 - 14
|
Create
storyboard for trailer, create actors profile and props, costume and location
lists |
September
14 - Oct 5
|
Begin
filming over course of two weeks |
October
8 - Nov 10
|
Edit
trailer |
October
5 - Oct 20
|
Continue
with research into chosen genre ie. icons, titles, etc.. |
Create ancillary task 1 | |
Create ancillary task 2 | |
Gain feedback on ancillary task 2 | |
December Christmas holiday | |
December Christmas holiday |
Subscribe to:
Posts (Atom)